Tempering furnace ROTA-1
|
Pulse controlled tempering furnace for ROTA 1 springs Method of operation: |
Tempering furnace ROTA-2
|
Pulse controlled tempering furnace for ROTA 2 springs
The springs are individually inserted into metal tubes 120/240 Pieces and passed through the heating chamber in pulsed movements. The advancing and removal processes are performed by compressed air. |